![]() |
High trestle for embankment fill. The new line was built on a 95-foot level and across the lowlands of the Gatun Lake region and number of long and high trestles for embankment fills, some of them 90-feeth high, had to be built. Here a Bucyrus pile driver drives in the massive trestle supports. |