Panama Canal Commission photos
showing the "new generation" equipment and methods for
the Cut Widening. Modern drill rigs, time delay blasting
and clean up. Gamboa Bridge can be seen off in the
distance in the photo above. The water surge I mentioned
can be seen in the blast photo. The aftermath of the blast
leaves the terrain very rough with a mixture of rock and dirt. |
|
 |